How to Quote Assemblies and Sub-Assemblies in Cableteque
1. Review the drawings you’ll be quoting 0:01
Start by opening the design drawings for the job.
In this demo, there are two PDFs:
a wire harness drawing with bill of materials
a fuse box assembly that includes the fuse box, fuses, and the harness from the first drawing
Confirm that one drawing is a standalone sub-assembly and the other is the full assembly that contains it.
2. Create a new quote in CableTech 0:24
Go into CableTech and create a new quote.
The quote can be created as a subassembly quote or left without detailed setup at this stage.
The next step is to upload the design files so CableTech can extract the assembly data.
3. Upload the design PDFs and let AI extract the data 0:39
Drag and drop the two PDF design files into the quote.
Let the AI extraction process the drawings.
Wait until the files finish processing before moving on.
4. Verify the extracted harness data 0:49
Open the extracted wire harness data.
Check that the partners/components have been captured correctly.
In the demo, the harness data appears correct, so the process continues without further edits.
5. Link the sub-assembly into the full assembly 1:09
Open the full assembly for the fuse box.
Locate the extracted partner for the wire harness from the previous step.
The harness is identified as ADWH250B in the demo.
Complete the linkage so the harness appears inside the full assembly BOM.
6. Confirm both the standalone sub-assembly and the full assembly 1:30
You should now see:
the wire harness as its own standalone sub-assembly with its bill of materials
the fuse box assembly containing the harness plus the fuse box components
This confirms CableTech can quote both the sub-assembly and the parent assembly together.
7. Source materials for the assembly 1:43
Go to the materials view.
Source all parts for the assembly, including:
fuse box components
relay
wire harness
CableTech will generate offers and help you select the best sourcing options.
8. Add labor for sub-assembly work if needed 1:58
Go to the labor section.
If the sub-assembly requires extra work, add it as a miscellaneous process.
Example from the demo:
fitting the harness into the sub-assembly takes 5 minutes
This helps improve labor estimation for the quote.
9. Review labor and continue to materials 2:27
Normally, you would complete all labor processes and update manual times as needed.
In the demo, labor is not fully completed because the focus is on the assembly/sub-assembly quoting flow.
The demo proceeds directly to materials, so the labor total shown is not fully representative.
10. Auto-pick the best material offers 2:46
CableTech generates sourcing offers for the materials.
In the demo, it finds 540 offers.
Use the automatic selection to pick the best offers.
Close the sourcing view once the selections are made.
11. Check sourced vs. unsourced items 2:56
Review the materials list after sourcing.
In the demo:
18 materials are listed
17 are sourced
1 item remains unsourced
Filter the unsourced item to confirm it is the wire harness sub-assembly, which is expected and acceptable in this setup.
12. Review pricing in the assembly and quote summary 3:19
Return to the assemblies view.
Open the assembly to see pricing for all items.
You should see:
item prices
offer items
partners
stock information
Then open the quote summary to see the full cost breakdown.
The summary includes:
the fuse box assembly materials
the wire harness sub-assembly
all associated electronic components
This final view shows how CableTech quotes both the parent assembly and the sub-assembly together.