How Cableteque Now Tracks Turnaround Time and Touch Time on a Quote
1. Open a completed quote to view timing metrics 0:00
CableTech Now starts tracking time as soon as a quote is created.
In this example, the quote is already fully worked: BOM uploaded, materials sourced, labor completed, and the quote is ready to finalize.
On the quote summary page, look at the top-right corner for:
Turnaround
Touch time
2. Mark the quote as done only when all work is finished 0:30
Use the Mark as done button only after the quote is completely finished.
Do not click it while you are still working on the summary page.
Confirm the action when prompted.
Once marked done, the quote status updates and the timing metrics are finalized.
3. Understand how turnaround time is calculated 0:42
Turnaround time is shown in whole calendar days.
It is rounded up to the next full day.
Examples:
Less than 24 hours = 1 day
More than 24 hours but less than 48 hours = 2 days
32 hours = 2 days
In the example shown, the quote was completed within 24 hours, so turnaround time displays as 1 day.
If needed, hover over the tooltip for the exact definition: calendar days from quote creation to when it is marked done, rounded up.
4. Understand how touch time is calculated 1:28
Touch time measures the total active time spent working on the quote.
It includes time spent interacting with the quote across all pages.
It only counts when someone is actively using the platform.
Time does not count if the quote is left open while you:
Walk away
Go to lunch
Stop interacting with the system
Hover over the tooltip if you need the calculation details again.
