Skip to main content

How to Calculate Labor in Cableteque

J
Written by Jeremy Hiltabidel

How to Calculate Labor in Cableteque

1. Open the quote and go to the assembly 0:00

generated-image-at-00:00:00

  • Open the quote you want to work on.

  • Navigate to the Assembly section.

  • This is where you’ll review the bill of materials and prepare labor calculations.

2. Review the bill of materials and confirm categories 0:11

generated-image-at-00:00:11

  • In the assembly, review the full bill of materials.

  • Look at the Category column, since categories drive labor calculations.

  • If a part has a green checkmark, it is usually recognized and its category may already be filled in.

  • If a category is missing, double-click the part and select the correct category manually.

3. Open the Labor page 0:47

generated-image-at-00:00:47

  • After all categories are set, click Labor in the top-right corner.

  • You can also access it from the menu on the left.

  • This takes you to the labor calculation page for the assembly.

4. Review the labor categories and understand the template 0:59

generated-image-at-00:00:59

  • On the Labor page, you’ll see multiple labor categories.

  • These categories depend on the data and rules configured for your shop.

  • The default CableTech template may differ from your actual labor standards.

  • Some calculations are automatic, while others require manual input.

5. Enter any missing quantities or manual values 1:18

generated-image-at-00:01:18

  • Some labor items require you to provide missing details, such as the number of wires to cut.

  • Enter the needed quantity directly into the field.

  • Example:

    • If you need to cut 5 wires, enter 5.

    • The system then calculates setup time and cycle time automatically.

    • In the example shown, this results in 15 minutes setup plus 15 minutes of cycle time for a total of 30 minutes.

  • That time is added to the total assembly time at the top.

6. Work through each category and complete the calculations 2:17

generated-image-at-00:02:17

  • Go through the labor categories one by one.

  • Confirm that each section is filled out correctly.

  • Some categories, like kitting, may already be fully calculated.

  • Others, like wire cutting, may require manual updates.

  • Apply your shop knowledge and assembly expertise to complete any remaining fields.

7. Review the total assembly time 2:49

generated-image-at-00:02:49

  • Once all categories are complete, check the total assembly time at the top.

  • This total reflects all labor calculations for the assembly.

  • You’ve now completed labor calculation in Cableteque.

Link to Loom

Did this answer your question?