Skip to main content

How to Create and Use a Labor Template

J
Written by Jeremy Hiltabidel

How to Create and Use a Labor Template

1. Open the Labor Template area from a Quote 0:01

generated-image-at-00:00:01

  • Start by opening the quote you want to work from.

  • In the quote menu, select Labor.

  • This takes you into the labor template area where templates can be viewed and edited.

2. Open Settings to view or create templates 0:10

generated-image-at-00:00:10

  • Click Settings in the top-right corner.

  • This is where all available labor templates are managed.

  • You will always see the CableTec default template.

  • To build your own, click Create New Template.

  • Please note to change the template to another one you click into the labor on the quote, into the drawing, then in the top right you have a template buttons you can use to change the template!

3. Name the template and add categories 0:20

generated-image-at-00:00:20

  • Enter a name for the new template.

  • Add categories as needed.

  • Categories are open fields, so you can create as many or as few as you want.

  • Example: enter Kitting as a category.

4. Add processes and labor details under each category 0:34

generated-image-at-00:00:34

  • Under each category, add one or more processes.

  • Processes are also flexible and can be added in any quantity.

  • For each process, enter any relevant labor details such as:

    • Setup time

    • Cycle time

  • Choose whether the process will be:

    • Manual entry

    • Automated

  • If automated, select how the system should calculate it:

    • By total component quantity

    • By unique part number quantity

  • Example: set a cycle time of 1 minute.

5. Save the template and continue editing later if needed 1:13

generated-image-at-00:01:13

  • Once the template is configured, click Save.

  • You can return later to:

    • Add new items

    • Edit existing items

    • Delete items

  • Templates are not final until you are ready to use them for labor calculation.

6. Check the assembly for uncategorized items 1:32

generated-image-at-00:01:32

  • When you're ready to calculate labor, open the assembly you want to work on.

  • Look for any notice about uncategorized items.

  • If items are uncategorized, labor may not calculate correctly until they are assigned categories.

7. Assign categories in the BOM if needed 1:43

generated-image-at-00:01:43

  • Click View BOM from the top-right area.

  • This opens the assembly BOM so you can update item categories.

  • Double-click an item and select the correct category.

  • Make sure all relevant items are categorized so labor calculations are accurate.

8. Return to Labor and complete the calculation 2:09

generated-image-at-00:02:09

  • Use the top-right buttons to move back and forth between the BOM and Labor views.

  • Open each category in the labor screen.

  • Fill in any required fields for the labor process.

  • Items marked as automatic will already be calculated and won’t need manual input.

  • For manual items, decide whether to add anything to the labor process before finalizing.

Link to Loom

Did this answer your question?