Skip to main content

Summary Tab Walkthrough

J
Written by Jeremy Hiltabidel

Summary Tab Walkthrough

1. Open the Summary tab after sourcing, RFQ, and labor are complete 0:00

generated-image-at-00:00:00

  • After finishing sourcing, RFQ, and labor, go to the Summary tab in CableTek.

  • This tab is where you review the quote at a high level and make final pricing adjustments.

  • Start by selecting Quote Level Totals to see the overall breakdown.

2. Review quote-level totals 0:14

generated-image-at-00:00:14

  • Click Quote Level Totals to view the main cost summary.

  • Review the breakdown of:

    • Cost

    • Labor

    • Factory cost

    • Selling cost

  • Use this view to confirm the quote is populated correctly before adjusting settings.

3. Configure pricing in the Settings tab 0:26

generated-image-at-00:00:26

  • Open the Settings tab in the top-right corner.

  • This is where you define how margin and lead time are calculated for each batch size.

  • You can choose between two margin methods:

    • Margin method / markup: apply a flat percentage margin.

    • Markup method: set separate markup values for materials and labor.

4. Set default labor rate and lead times 0:36

generated-image-at-00:00:36

  • In Settings, enter the labor rate.

  • Add any additional lead time if needed.

  • Set a default assembly lead time.

  • These defaults help standardize how quotes are calculated going forward.

  • The transcript notes:

    • Lead time from inventory

    • Default assembly build lead time

5. Apply and save the margin method 1:01

generated-image-at-00:01:01

  • After entering your settings, click Apply and then Save.

  • Once saved, the quote updates to reflect the selected margin method.

  • Example shown in the video:

    • Gross profit margin displays at 35%

    • Lead time and profit values update based on the quote inputs

6. Use the markup method when you need separate material and labor markups 1:20

generated-image-at-00:01:20

  • Switch back into Settings to use the alternate markup method.

  • This method still uses the same default labor rate and lead time fields.

  • It also lets you set:

    • Markup

    • Material markup

    • Labor markup

  • This gives more control over how different cost components are priced.

7. Copy settings across batch sizes or set them as the default 1:32

generated-image-at-00:01:32

  • Use Copy to all batches if you want every batch size to use the same pricing method.

  • Use Set as default if you want future quotes to automatically start with these settings.

  • This is useful when your pricing approach is consistent across jobs.

  • Example from the transcript:

    • Labor rate is always set to 60%

    • Additional lead time is always added

    • Flat margin method markup is used by default

8. Review how pricing changes by batch size 2:05

generated-image-at-00:02:05

  • After saving, return to the quote and review each batch size.

  • You’ll see the profit and other values change depending on the selected settings.

  • This helps confirm that the pricing logic is applying correctly across the quote.

9. Expand the table to inspect the cost breakdown 2:14

generated-image-at-00:02:14

  • Click the expand table control to see a more detailed breakdown of the wire harness quote.

  • Review the sections for:

    • Materials cost and markup

    • Labor with standard labor rate and markup

    • Assembly cost

    • Selling cost

    • Factory cost

    • Other related cost details

10. Add additional costs such as tooling or testing 2:38

generated-image-at-00:02:38

  • Open the Additional Cost section to add extra charges.

  • These are entered as flat-rate additions.

  • Examples mentioned in the video:

    • Tooling

    • Testing

    • Other custom charges

  • Use the Edit button to add and save these charges.

11. Export or download the final quote 3:11

generated-image-at-00:03:11

  • Once the quote is complete, you can download the quote document.

  • You can also export to Excel for sharing or further analysis.

  • This is the final step after reviewing pricing and adding any extra costs.

Link to Loom