Create an RFQ with Multiple Vendors and Apply a Flat Summarized Cost

Objective

This explains how to create a request for quotation (RFQ) for a material sourced from multiple vendors, apply a single summarized cost across suppliers, and mark available stock so lead time is not counted. It ensures the material can be sourced accurately in the system with the correct vendor, cost, and stock status.

Key Steps

1. Create a new RFQ for the material 0:16

generated-image-at-00:00:16

  • Open the material or project you want to source.

  • Create a new RFQ for the item.

  • Use this RFQ when you need to compare or combine sourcing from multiple vendors.

  • Example vendors mentioned:

    • Digi-Key

    • Mouser

    • Highland

2. Add all relevant vendors to the RFQ 0:40

generated-image-at-00:00:40

  • In the RFQ, include every vendor that can supply the part.

  • Confirm the vendors you want to source from before moving forward.

  • This step helps you track all possible supply options in one place.

3. Edit the RFQ and enter a flat summarized cost 0:55

generated-image-at-00:00:55

  • Open the RFQ and select Edit.

  • Enter the summarized or flat cost you want to use across all suppliers.

  • Example:

    • If the combined cost is 1.25, enter 1.25 as the RFQ cost.

  • Save the RFQ after entering the cost.

4. Mark available stock quantity to avoid lead time impact 1:14

generated-image-at-00:01:14

  • Verify that the vendors have the required quantity in stock.

  • If the needed quantity is available, enter the stock quantity in the RFQ.

  • Example:

    • If you need 5 units and the vendors have 5 available, add 5 at stock.

  • This prevents lead time from being counted against the order.

  • Save the updated RFQ.

5. Select the RFQ option in the materials record 1:33

generated-image-at-00:01:33

  • Go to the Materials section for the item.

  • Find the material record and select the RFQ option you created.

  • Confirm that the cost shown matches the summarized cost you entered.

  • This links the material to the correct sourcing option.

6. Confirm sourcing details are reflected correctly 1:46

generated-image-at-00:01:46

  • Review the final sourcing summary.

  • Confirm the system shows:

    • The selected vendors

    • The item is in stock

    • The quantity is available in time

    • The flat summarized cost is applied

  • Use this final check to ensure the material is sourced correctly and consistently.

Cautionary Notes

  • Make sure the vendors you list actually have stock before marking the quantity as available.

  • Only use a flat summarized cost if that is the intended pricing method for all selected suppliers.

  • Double-check the quantity entered so it matches the real available stock.

  • Save after every major edit to avoid losing changes.

Tips for Efficiency

  • Group all vendors into one RFQ when sourcing the same part from multiple suppliers.

  • Use a single summarized cost when you want a simplified cost basis across vendors.

  • Enter stock quantity immediately after confirming availability to reduce lead-time errors.

  • Review the material record after saving to ensure the RFQ selection carried over correctly.

Link to Loom