Set Material Due Dates and Lead Times

P
Written by Prarthana Gupta

Set Material Due Date and Auto-Pick Offers Based on Lead Time in Cableteque

This explains how to configure a quote in Cableteque so only offers that can arrive by the required material due date are shown. It helps ensure selected suppliers meet the project timeline before auto-picking the best offers.

Key Steps

1. Enable the Material Due Date filter for sourcing 0:01

generated-image-at-00:00:01

  • In Cableteque, open the sourcing options for the quote.

  • Turn on the setting for material due date.

  • This filter limits results to offers whose factory lead time can meet the batch material due date.

2. Save the sourcing settings 0:11

generated-image-at-00:00:11

  • After enabling the material due date option, click Save.

  • Confirm the setting is applied before moving to the quote details.

  • This ensures future offer selection uses the due-date constraint.

3. Set the quote’s material due date 0:25

generated-image-at-00:00:25

  • In the top-left area of the quote, locate the quote name and related settings.

  • Open the material due date field.

  • Enter the required date by which materials must arrive.

  • Example: set the due date to the end of August if all materials are needed by then.

4. Save the due date and auto-pick best offers 0:31

generated-image-at-00:00:31

  • Save the quote after entering the material due date.

  • Run Auto-Pick All Best Offers.

  • Cableteque will now only display offers that can arrive before the selected due date.

5. Review the filtered offer results 0:43

generated-image-at-00:00:43

  • Review the offers returned by the system after auto-picking.

  • Confirm that in-stock items and eligible lead times are being selected.

  • Check any out-of-stock items carefully to ensure the system is still meeting the due-date requirement.

6. Verify the selected supplier meets the lead-time requirement 0:53

generated-image-at-00:00:53

  • Inspect the chosen offer for each part.

  • Confirm the selected supplier has the shortest lead time that still meets the due date.

  • Example: Highland was selected because its 33-day lead time allowed the part to arrive in time.

7. Confirm non-selected offers were excluded for timing reasons 1:01

generated-image-at-00:01:01

  • Review why other suppliers were not chosen.

  • If an offer was excluded, verify it would have arrived after the material due date.

  • Use this check to validate that the filter is working correctly and protecting the project schedule.

Cautionary Notes

  • Do not assume the lowest-cost offer will be selected if it cannot meet the material due date.

  • Make sure the material due date is saved before running Auto-Pick All Best Offers.

  • If the due date is entered incorrectly, the system may filter out valid offers or select unsuitable ones.

  • Always verify the selected supplier’s lead time against the required date before finalizing the quote.

Tips for Efficiency

  • Set the material due date as early as possible in the quoting process to avoid rework.

  • Use the due-date filter before reviewing offers to reduce manual sorting.

  • After auto-picking, quickly scan for out-of-stock items and long lead times to confirm the results are aligned with the schedule.

  • Keep the quote’s required date updated whenever project timelines change.

Link to Loom

Did this answer your question?