Purpose of the Summary Page:
The Summary page provides a consolidated commercial and costing overview of the quote across all selected batch sizes.
It combines the following into a single quote-level pricing view.
Material costs
Labor costs
Additional costs
Selling price
Profitability
Lead time
The page also allows users to:
Review assembly-level pricing
Edit additional costs
Switch batch quantities
Generate quote exports
Page Layout Overview:
The page contains the following sections:
Section | Purpose |
Quote Header | Displays quote information |
Batch Size Selector | Switches pricing view by quantity |
Quote-Level Totals | Aggregated pricing summary |
Additional Costs Summary | Roll-up of one-time costs |
Profitability Summary | Profit, margin, and lead time |
Assembly Cost Breakdown | Detailed pricing breakdown per assembly |
Settings | Pricing method and quote-level pricing inputs |
Download | Export quote document |
1. Quote Header:
Quote header contains the following information about the quote.
Field | Description |
Quote ID | Unique quote identifier |
Quote Name | Name of the quote |
Description | Quote description |
Customer | Customer associated to the quote |
Created | Quote creation date |
Due Date | Quote due date |
2. Batch Size Selector:
This section is extremely important, and the following is calculated and refreshed based on the selected batch size.
All totals
Profitability
Costs
Additional costs
Assembly cost breakdowns
The user can select a batch size by clicking on the required batch size value.
3. Quote Level Totals:
The details of Quote-Level Totals can be accessed by clicking anywhere on the Quote-Level Totals bar to expand it.
3A. Quote-Level Aggregation Calculations:
Field | Formula |
Material Cost | Σ Material Cost / Assembly all assemblies |
Labor Cost | Σ Labor Cost / Assembly all assemblies |
Factory Cost | Σ Factory Cost / Assembly all assemblies |
Selling Cost | Σ Selling Price / Assembly all assemblies |
3B. Quote-Level Additional Costs:
Field | Formula |
Tooling/Testing | Σ Tooling/Testing all assemblies |
FAI | Σ FAI all assemblies |
Tariff | Σ Tariff all assemblies |
Mating/Jig | Σ Mating/Jig all assemblies |
Others | Σ Others all assemblies |
Total Additional Costs | Sum of all Additional Cost fields |
3C. Quote Profitability Calculations:
Field | Formula |
Profit | Quote Selling Cost − Quote Factory Cost |
Gross Margin % | (Quote Profit ÷ Quote Selling Cost) × 100 |
3D. Quote-Level Lead Time:
Field | Formula |
Lead Time | Highest Assembly Lead Time + Additional Lead Time |
3E. Quote-Level Excess Cost Calculations:
Field | Formula |
Excess Cost/Excess inc. Tariff | Total Raw Material Excess Cost + Tariff Excess Cost |
The breakdown of Excess cost can be accessed by hovering over the i (info) icon present beside the Excess inc. Tariff cost in Quote-Level Totals under Total Additional Costs.
4. Settings:
The settings is used to define the method of calculation (Margin/Markup), Labor rate and other necessary fields required for calculating the finalised quote cost.
4A. Settings Scope Behavior:
Behaviour | Description |
Global Default Settings | Default pricing settings used for newly created quotes |
Quote-Level Settings | Settings applied only to the current quote |
Batch-Level Settings | Settings applied only to the selected batch size |
Existing Quote Protection | Changes to defaults do not modify existing quotes |
When Global Default Settings is used the system would display a Default Settings Badge indicating that the default settings is being used for the current quote.
When a custom settings (Quote-Level settings) is used, the system would display CUSTOM SETTINGS APPLIED Badge indicating that the settings apply only to the current quote.
4B. Batch Size Settings Logic:
Behaviour | Description |
Independent Batch Settings | Each batch size can maintain its own pricing settings and values |
Default Inheritance | Batch sizes can inherit values from global quote defaults |
Batch-Level Override | Users can modify settings independently for a selected batch size |
Batch Persistence | Modified batch settings remain stored until manually changed |
5. Pricing method and Calculations:
The Summary page supports two pricing methods: Switching pricing methods recalculates all dependent values.
The detailed calculations for each assembly will be available under Assembly Cost Breakdown.
Method | Purpose |
Markup | Adds markup percentages to Material and Labor costs |
Margin | Calculates selling price using a target margin percentage |
Markup method:
Margin Method:
5A. Markup Method Calculations:
Material Calculations:
Field | Formula |
Base Cost | Sum Product(Unit Price × Qty) from Materials BOM |
Material Markup % | From settings |
Material Cost / Unit | Base Material Cost + (Base Material Cost × Material Markup %) |
Material Cost / Assembly | Material Cost / Unit × Assembly Qty |
Lead Time | Highest Material Lead Time in Assembly |
Labor Calculations:
Field | Formula |
Hours | (Setup Time ÷ Batch Size) + Cycle Time |
Rate | From settings |
Base Labor Cost | Hours × Rate |
Labor Markup % | From settings |
Labor Cost / Unit | Base Labor Cost + (Base Labor Cost × Labor Markup %) |
Labor Cost / Assembly | Labor Cost / Unit × Assembly Qty |
Factory Cost Calculations:
Field | Formula |
Factory Cost / Unit | Base Material Cost + Base Labor Cost |
Factory Cost / Assembly | Factory Cost / Unit × Assembly Qty |
Selling Price Calculations:
Field | Formula |
Selling Price / Unit | Material Cost / Unit + Labor Cost / Unit |
Selling Price / Assembly | Selling Price / Unit × Assembly Qty |
Profitability Calculations
Field | Formula |
Profit / Unit | Selling Price / Unit − (Base Material Cost + Base Labor Cost) |
Profit / Assembly | Profit / Unit × Assembly Qty |
Gross Margin % | (Profit / Unit ÷ Selling Price / Unit) × 100 |
5B. Margin Method Calculations:
Material & Labor Calculations:
Field | Formula |
Base Cost | Sum Product(Unit Price × Qty) from Materials BOM |
Material Cost / Unit | Base Material Cost |
Material Cost / Assembly | Material Cost / Unit × Assembly Qty |
Lead Time | Highest Material Lead Time in Assembly |
Hours | (Setup Time ÷ Batch Size) + Cycle Time |
Rate | From settings |
Base Labor Cost | Hours × Rate |
Labor Cost / Unit | Base Labor Cost |
Labor Cost / Assembly | Labor Cost / Unit × Assembly Qty |
Selling Price Calculations:
Field | Formula |
Margin % | From settings |
Selling Price / Unit | (Material Cost / Unit + Labor Cost / Unit) ÷ (1 − Margin %) |
Selling Price / Assembly | Selling Price / Unit × Assembly Qty |
Profitability Calculations:
Field | Formula |
Profit / Unit | Selling Price / Unit − (Base Material Cost + Base Labor Cost) |
Profit / Assembly | Profit / Unit × Assembly Qty |
Gross Margin % | (Profit / Unit ÷ Selling Price / Unit) × 100 |
6. Assembly-Level Additional Costs:
The additional costs for an assembly can be added by navigating to the Edit Assembly view using Edit button.
Cost Type | Source |
Tooling/Testing | Manual user entry |
FAI | Manual user entry |
Mating/Jig | Manual user entry |
Others | Manual user entry |
Tariff | Auto-calculated from material tariff calculations (editable) |